Milestones
Milestones – the FPT History
2009
Cooperation with Bobst (Development of a Bunch Roboter "Archimedes")
2009
FPT Robot Programming based on Graphics
The whole process will be programmed by icons.
The operation of the six-axis-robot is easy like the Selogica machinecontrol of Arburg.
2007Cooperation with SSI Schäfer Noell in sector intralogistics
2006New
buildings for assembly shop & training center
2006
Cooperation with Bobst Group Deutschland GmbH
2005
New palletizing line at
Ravensburger Spieleverlag
Modernization of logistics.
2003
FPT develops a new generation of robots:
FPT Subito2001Cooperation with KUKA – ensures KUKA compatibility of all FPT robots
1998
Cooperation with the FGK pharmaceutical board packaging research organisation
1997Cooperation with Arburg
1996
Construction of the new production site in Amtzell
1995
New field of activity: Packaging industry – manufacture of packaging and palletizing lines
1993Development of our own FPT robot system
1986“Modular Transfer System” designed for solving logistic tasks at the periphery of handling systems; development of a handling system for the plastics processing industry
1984
New field of activity: Automation of metal-removing machines
1982Cooperation with Star Seiki Japan; since then, integration of handling systems for the automation of injection molding machines
1982
Foundation of the company in Wangen
Initial fields of activity: Tool & fixture making for the plastics industry